Thursday, August 25, 2011

Getting Close!!!

Its been a few weeks since the last update. We cant get inside the house so its hard to take photos.
All sinks have been in installed along with shower screens, door handles, door stops, towel rails, Front Render colour applied, Front Door Handle, All electrical fitted off all plumbing fitted off besides the kitchen sink.

We cant be to far off, Laminate timber floors need to be put down, Pantry and robe shelves still need to be installed but I think that's about it. They have a few cosmetic things to fix too and no doubt we will find a few more things on Pre handover with the inspector.

So far its been a fairly good experience but I will say that you need to keep an eye on everything during the build and get a 2nd opinion if you have a hunch that something is not done correctly. We have used a private inspector at 3 stages and he has been worthwhile. I have also picked up numerous things that have been done incorrectly over the build.

Anyway here are the photo's










Monday, August 8, 2011

Retaining wall almost completed

Hi,
After a big day Saturday Laz, Mel and myself completed what we could currently complete with the retaining wall. I'm waiting for the builders to replace their section of wall that is plumb and doesnt have a 5 degree lean as per engineering plans.  Here are the pics




Friday, August 5, 2011

Side fence completed, and more pictures of tiles.

Side fence is now completed in the back yard. They have done a really great job and I'm pretty impressed with there work. Tomorrow is the day to finish off the Retaining wall more pictures to come.

I also have included some pictures of the laundry tiles and some tiles starting around the bath hob and shower. Pretty crappy photos due to having dirty windows. Obviously no grout done yet either.







Thursday, August 4, 2011

Retaining wall half completed, Fence going up and Paint completed

It's been a while since i posted but its becuase we cannot get into the house to take photo's. Retaining wall is now half completed and should be completely finished by Sunday. Fence blokes started yesterday and will be finished tomorrow hopefully. Painting has also been completed and a render base coat applied to the facade of the house.

Shower bases have been installed and by the looks of it tiling to come.




 Front Render looks good but return on left side does not represent the same distance as the post on the right. This is getting fixed in the next 2 weeks then colour coat applied.
 Builder is replacing original retaining wall to meet correct engineering of 5 deg tilt that my wall has.








One of the posts is a bit wonky it has now been repaired.

Sunday, July 10, 2011

Site cut Completed and prepared for the next stage!

Was a long day today in the rain and wind, Was not impressive weather at all and a big thanks goes out to My Uncle Don and Cousin Christian for putting in a great effort on such a shitty day. Thanks to Craig who supplied the pie's they were also pretty impressive. All post holes have been dug and site is cut ready for the next stage the retaining walls. Hopefully we can make a start and possibly finish them by the end of next weekend. Time to lay in bed and relax I think...

Don doing his thing with the excavator

Post holes n the left all dug out and ready for some posts, Nice and wet hey..

Nice and et lots of rain


Friday, July 8, 2011

Front Facade and Cabinets Inside

Here we are again, Internal cupboards have been installed. No bench tops yet they will come later. Also the front Facade has nearly been finished. Boris is heading over on the weekend to start and finish the window arc's. Plaster appears to be finished with all cornices also installed. It's all coming together now.